Jump to content

RT program problem.


---
 Share

Recommended Posts

I'm putting the RT qualification program for my 543 O-inspect in Autorun. I translated the measurement plan comment to English (Calypso language is set to English, but still displays everything in German)? The program is written to use a Start Alignment. I had a small dowel inserted next to the cylindrical shaft that fits in the RT to clock the tooling ball, so it will start in the exact same spot each time. Then I set the program to run - Selection - Start Alignment - RT-Achse. This way the operator doesn't have to do the start alignment each time. Below is part of the measurement plan comment, and I'm not quite sure what the second part (Note) means? I translated this using an on-line web-site, so it might be a little muddled?

the base system has not yet been made. Start CNC flow now, after which you will be guided via dialogues.

Note: If manual base system is made before the CNC process, !!! Turntable reference point travel !!!
Link to comment
Share on other sites

 Share

×
×
  • Create New...