Jump to content

Datum simulator


---
 Share

Recommended Posts

I have a cylindrical part that engineering wants measured with the O-inspect. I need to utilize the rotary so I can use DotScan. The problem is, the only area of the part that can be held by the rotary is the primary datum. They are suggesting a pin of the same diameter to establish the datum, prior to loading the part. Thoughts?
Link to comment
Share on other sites

Please sign in to view this quote.

I'm not sure how repeatable that would be...
Can you provide a sketch of the part that needs to be held/located?

For parts that I cannot locate in a 3 jaw chuck, (depending on the part) I manually center the part on the rotary table and secure it in place with clamps or magnets, or I have a shallow fixture made (that is held by the chuck) that locates the part diameter, and I use a small amount of glue to hold it.
Link to comment
Share on other sites

The short purple cylinder on the left is Datum -A-, and is held by the rotary
3 jaw chuck. The cone at the tip is evaluated for surface profile back to -A-
150_aef8f96cc84ca2ee2c409bb578e69869.png
Link to comment
Share on other sites

Can you make a fixture with 4 stand-offs and round points to create a type of V-block to support the long shaft and hold the part at the center line of the chuck, then just put enough of the A cyl. into the chuck so it can rotate the part but leave enough of it out to still check the A cyl. Using a pin assumes that the A datum is exactly the same as the pin.
Link to comment
Share on other sites

I thought about that, but it would only leave about .200" of the -A- surface to probe.
I wanted the chuck to hold on to the entire -A- surface. That's still an option though, thanks.
Link to comment
Share on other sites

Clarke,

What I've done when I absolutely have to clamp on the Datum in similar cases is : Measure/probe right between the chuck jaws - 3x single point pattern circles; 1 top and 1 bottom to create the cylinder.

Has worked well in the past.

Good luck.
Link to comment
Share on other sites

Please sign in to view this quote.

Management wants it on the O-inspect, using the rotary. They also want me
to try the Keyence but that only measures in 2d and offers line profile only.
Link to comment
Share on other sites

I ended up pulling the part (Datum -A-) half way out of the rotary so I
could have access to enough of it's surface to at least measure a circle.

I'm doing a type 1 right no to see if that works well enough.
Link to comment
Share on other sites

Please sign in to view this quote.

I'm so glad to have a manager & engineers who listen to reason...
I would use the v-block method, for comparison.
Link to comment
Share on other sites

 Share

×
×
  • Create New...