Jump to content

Do I need PCM? Is there another way?


Recommended Posts

I have a program with multiple mini plans setup within it, the operator selects the desired mini plan based on which CNC Machine the part is being produced on. Each mini plan has different reference dimensions that are specific to each CNC machine for getting the part dialed in.

My question is, is there a way I can set up an input prompt at the beginning of the program to que the operator to select which machining center they are setting up and then Calypso runs the corresponding mini plan? Is PCM required for this type of action or is there another way?
Link to comment
https://qualityforum.zeiss.com/topic/17588-do-i-need-pcm-is-there-another-way/
Share on other sites

×
×
  • Create New...