Jump to content

Probe-Check


Recommended Posts

We just placed the machine on the floor on Monday and it will be installed in November. I think it's important as we are trying to verify Yasda Machining Centers with sub-micron accuracies. I feel this is the best way to make sure the CMM is still running good in-between calibrations.

Things you need to factor.
Cost of the gauge
Calibration of gauge
Cost of Zeiss program (optional)

Prismo Ultra 1.jpgPrismo Ultra 2.jpgPrismo Ultra 3.jpgPrismo Ultra 4.jpg

Link to comment
https://qualityforum.zeiss.com/topic/18238-probe-check/#findComment-102604
Share on other sites

Please sign in to view this quote.

As well as being the Zeiss distributor for New England, we also sell Yasda Machining Centers and Nakamura Turning Centers. Some models are capable of holding under 2 microns and some models can hold half-micron tolerances however they have to be in the right environment. So, we built a "High Performance" Tech Center. Temperature and Climate Controlled, 3 foot thick footings, high-speed garage doors, etc. In order for us to prove the machines can do what they say they can do, we bought the Prismo Ultra. We're hoping it can do the job. Our Grand Opening is coming soon.
Link to comment
https://qualityforum.zeiss.com/topic/18238-probe-check/#findComment-102614
Share on other sites

I'm not saying I wanted that quote or anything but I noticed it only took me 3 minutes to reply.

I have a brand new lab that I operate out of and we are building another brand new one as well. Everything looks of high quality and new with the exception of my desk. We had an intern order the desk for the lab and I'm pretty sure these are wal-mart specials. The desk are already losing their structural integrity which is totally lemons; However, I plan on using that as a justification to buy better desk and make lemonade.
Link to comment
https://qualityforum.zeiss.com/topic/18238-probe-check/#findComment-102628
Share on other sites

  • 8 months later...
×
×
  • Create New...