Jump to content

How to determine CMM run time


---
 Share

Recommended Posts

I am trying to find out how to determine how much time per day a CMM is running a program. Not a specific program, all run time.
Is there a utility or something that I can use?
Link to comment
Share on other sites

I use little PCM code to write to file time of measuring after running program, from this file I can calculate how much time CMM work in day. But some measurements operators do manually.
Link to comment
Share on other sites

TIME_MEAS = getRecordHead("dmesn") + " " + getRecordHead("planid") + " " + getRecordHead("operid") + " " + getRecordHead("date") + " " + getRecordHead("time") + " " + getRecordHead("partnbinc") + " " + getRecordHead("durationofrun") + " " + getRecordHead("temperatureworkpiece") + " " + getRecordHead("order")
addToFile("D:\user\protocols\time.txt", TIME_MEAS)

you can add any fields if you want
Link to comment
Share on other sites

  • 2 weeks later...
What is PCM code? I mainly use very basic Calypso aspects, and have never heard of calypso "PCM", but i would like to check run time, and perhaps other things in the future.
Link to comment
Share on other sites

Please sign in to comment

You will be able to leave a comment after signing in



Sign In
 Share

×
×
  • Create New...