[Ch...] Posted yesterday at 02:53 PM Share Posted yesterday at 02:53 PM Hi, I am measuring with an Aramis system within Correlate 2023. I have about 10 measurements of 1000 frames each (file is approx. 15Gb big). The software starts to get really slow. After each measurement I have to wait something like 15 min (maybe even more) before all frames have been added and the project has been updated. I understand that it gets slower to save the larger file. But also starting a new measurement series takes longer. Is this a common problem? Are there anyway to speed things up despite the increasing size of the project? Thanks in advance for any tips, Chris Link to comment Share on other sites More sharing options...
[Ch...] Posted yesterday at 03:30 PM Author Share Posted yesterday at 03:30 PM Just renaming a stage range takes a long time as well for example. Link to comment Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in