[Cl...] Posted Monday at 07:23 PM Share Posted Monday at 07:23 PM (edited) I thought the PCM syntax was 28 = rad(55.0). This isn't working. Not a result element, but in the parameter database. Edited Monday at 07:24 PM Link to comment Share on other sites More sharing options...
[To...] Posted Monday at 07:42 PM Share Posted Monday at 07:42 PM (edited) Not as PCM experienced as you, but I'm wondering if a numeric value can be used as a variable. "28" Edited Monday at 07:42 PM Link to comment Share on other sites More sharing options...
[Cl...] Posted Monday at 07:59 PM Author Share Posted Monday at 07:59 PM (edited) Like this? Twenty_Eight = rad(28.0) Edited Monday at 08:00 PM Link to comment Share on other sites More sharing options...
[Cl...] Posted Monday at 08:01 PM Author Share Posted Monday at 08:01 PM Answered my own question. Link to comment Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in