[Jo...] Posted Friday at 07:18 PM Share Posted Friday at 07:18 PM I have several PCM codes that run in the beginning of programs, but when i run a subsequent evaluation, it will error because that run was not run in the normal order. I believe it is not calculating or reading probe data (getProbe().variables) when it is in subsequent evaluation mode. looking for something i can put in the "inspection_start_pcm" like this.... if program == SE then not do something else do something endif Link to comment https://qualityforum.zeiss.com/topic/27910-using-pcm-to-see-if-subsequent-evaluation-is-running/ Share on other sites More sharing options...
[Ri...] Posted Friday at 08:56 PM Share Posted Friday at 08:56 PM getRunMode("subsequentEvaluation") Link to comment https://qualityforum.zeiss.com/topic/27910-using-pcm-to-see-if-subsequent-evaluation-is-running/#findComment-158506 Share on other sites More sharing options...
[Jo...] Posted 2 hours ago Author Share Posted 2 hours ago ok now i feel dumb... I looked at that and did not even see that parameter. Link to comment https://qualityforum.zeiss.com/topic/27910-using-pcm-to-see-if-subsequent-evaluation-is-running/#findComment-158564 Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in