[Ll...] Posted October 24 Share Posted October 24 We are using Calypso 2021 and have multiple positions on an assembly allowing datum shift for datum B, an OD. I am under the impression that in this version you can apply datum shift but the software does not account for other positions using that same datum. Am I correct? If so, has this been corrected, improved in later versions? Link to comment Share on other sites More sharing options...
[Ma...] Posted October 24 Share Posted October 24 You mean MMB? Link to comment Share on other sites More sharing options...
[Ll...] Posted October 25 Author Share Posted October 25 Yes. MMB is datum shift as I understand it. Am I incorrect to use that term? Link to comment Share on other sites More sharing options...
[Jo...] Posted October 25 Share Posted October 25 Please sign in to view this quote. I assume your concern is simultaneous requirement with same DRF on other features. I would try grouping ALL the same DRF requirements into a pattern, and see what you get. You can grab the Datum shift values from each one and report in Result Element. Link to comment Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in