Jump to content

True Position- Datum construction


---
 Share

Recommended Posts

I am having trouble with the TP results, getting a +tol of 1005.46mm. How do I construct Datum-B-? Should I trust the 10.30mm results? See attached rough draft. 153_782fcee93c8ce95316dc04afaa5adf0e.png
Link to comment
Share on other sites

Use best-fit bore pattern on 3 holes for Datum B allowing rotation and translation, then use best-fit bore pattern for the larger hole referencing |A| Primary and best-fit |B| secondary without allowing either rotation or translation but using MMC and MMB
Link to comment
Share on other sites

Thanks for responding! Datum-A- is a plane that Z origin is aligned, X and Y origin to the Bolt Circle for base alignment. FCF is the dimensioned hole center 6.4MMC to the -A- plane and -B-MMC of 3x holes. I attached the settings I used.153_518ad749363555abe169dfe87ca3b326.png
Link to comment
Share on other sites

 Share

×
×
  • Create New...