Jump to content

how to check tp 0.4/100|ME2|100%


---
 Share

Recommended Posts

I vaguely remember a drawing with this notation decades ago. The idea was to measure how much the drill "walked"/drifted in the material. A position check from ME2 for 100% of the length. Position check every 100mm. First check would be from ME2 to 100mm. Second check 100mm to 200mm. And so on. Again, this is a decades old memory of what was then an old drawing. 😃

CMMGuys forum may have other opinions or help.
Link to comment
Share on other sites

 Share

×
×
  • Create New...