[Da...] Posted July 15, 2022 Share Posted July 15, 2022 Problem: The true position of the holes around a tube refers to only a primary and secondary datum. So, a 3D line was created between theoretical points on the center of the tube and one of the holes. The problem is that when we use this line as our tertiary datum, the hole we are rotating/clocking to has a small deviation in the direction that should be locked to zero. Solution: Change Base alignment to use drawing datum features. Change recalled line Least-Squares evaluation to “From feature”. Is this the correct solution or if you have recommendation for doing a different alignment scenario. It seems this method is more complex than it needs to be. Also not sure what to think of the warning that pops up after recalling the two points for the 3D line. Link to comment Share on other sites More sharing options...
[No...] Posted July 15, 2022 Share Posted July 15, 2022 First two images are missing. Link to comment Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in