[To...] Posted June 28, 2022 Share Posted June 28, 2022 I'm in the process of creating a setup sheet depicting stylus system and fixturing setups and was wondering if anyone had a sample setup sheet they'd be willing to share on the forum? TIA Link to comment https://qualityforum.zeiss.com/topic/10110-setup-sheets/ Share on other sites More sharing options...
[Ma...] Posted June 28, 2022 Share Posted June 28, 2022 I was only doing fixturing setups in 3D PDF ( I did all models of kit, then assembly and save as 3D PDF ) We do not need stylus infos ( using mainly only 6 configs ) Link to comment https://qualityforum.zeiss.com/topic/10110-setup-sheets/#findComment-48196 Share on other sites More sharing options...
[Ri...] Posted June 29, 2022 Share Posted June 29, 2022 Please sign in to view this quote. Have a look at this. Master is empty of data File naming: Part Number_Rev Level_Description_ Date (revision controlled by date)Part Number_Revision Level_Descriptiong_06-28-2022.xlsxMaster CMM Setup workbook.xlsx Link to comment https://qualityforum.zeiss.com/topic/10110-setup-sheets/#findComment-48198 Share on other sites More sharing options...
[Ja...] Posted June 29, 2022 Share Posted June 29, 2022 I just use power point. I take pictures of everything and add a description of what a person needs to know(probes required, fixtures, fixture location, and how the part needs to be aligned on the fixture. I use a batch file "inspection_post_load" to make the power point open automatically when the program is opened. Link to comment https://qualityforum.zeiss.com/topic/10110-setup-sheets/#findComment-48200 Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in