Jump to content

Merging Measurement Plans


Recommended Posts

So I looked around the forum and saw a post explaining that the option for merged plans are for a horizontal CMM. I was wondering if there's a way to use the previous OPs measurement plan to roll it over for the next Op. Sorry if I'm not being clear. I have a turn print that's not much different from the finish, can I use that like a copy that way I can go in and change what I need to instead of making a new plan for the finished part? I was asked to make plans for every Op so any advice is appreciated! Using Calypso 2018 6.6 Contura vast XT
Link to comment
https://qualityforum.zeiss.com/topic/15918-merging-measurement-plans/
Share on other sites

Please sign in to view this quote.

Yeah. I worked on a master measurement plan that encompassed every operation of a part. The Base Alignment changed significantly between some operations. Automatic Start Alignments work well for some of these challenges. Every challenge is unique though.
×
×
  • Create New...