Jump to content

Constrainig Datums


Recommended Posts

Question,
Hole X .005 to Datum A B C
Don't I set it up in the position to be. Datum A no constraints, Datum B constrain to Datum A, Datum C constrain to Datum A and Datum B. I have an old program that has no constraints to the datums. But my new programs are doing constraining like above.
I know I set up my programs to start constraining the Datums but it has been a while and I am trying to make sure I explain it correctly
Thanks
Link to comment
https://qualityforum.zeiss.com/topic/16078-constrainig-datums/
Share on other sites

About the ISO5459 Check box. To use or not to use. It looks like by using it, Calypso conforms to hitting all surfaces on each plane like we were shown in a lunch and learn. I though I was told to use it in a class or the lunch and learn so I have been. Now I'm questioning whether I should be. What are the guide lines. I here stuff, read stuff and I can never remember where from and when to , or not to do some things. This is one I have been questioning but never would ask.
Link to comment
https://qualityforum.zeiss.com/topic/16078-constrainig-datums/#findComment-89014
Share on other sites

×
×
  • Create New...