Jump to content

LOTO Lock Out Tag Out


Recommended Posts

I honestly admit, before this post I had never heard of LOTO. I had to google the meaning. 🤣
Sounds like a new swollen-headed name for a self-evident thing, allowing safety inspectors, who already pushed safety to a ridiculous limit, to further justify their existence.

Sorry for grumbling, I'm speaking out of bad experience. 😡
Link to comment
https://qualityforum.zeiss.com/topic/19278-loto-lock-out-tag-out/#findComment-108488
Share on other sites

Thanks all.
We did incorporate the main power switch, and the air supply... just hope the procedure does not walk over the Zeiss technicians procedures. From what I hear (from the tech) that can create another cumbersome mess, procedurally...
I don't think I have ever seen a tech shut off the air to to their job, so I'm hoping there won't be an issue
Link to comment
https://qualityforum.zeiss.com/topic/19278-loto-lock-out-tag-out/#findComment-108498
Share on other sites

  • 5 months later...
Our LOTO simply has us unplugging the whole machine. Although adding in a lockout requirement for the air supply would be better (as mentioned above). We are able to cut off the air supply with a handle by the wall. We just don't explicitly state its use for the LOTO of our CMMs.
Link to comment
https://qualityforum.zeiss.com/topic/19278-loto-lock-out-tag-out/#findComment-108500
Share on other sites

  • 3 weeks later...
×
×
  • Create New...