[Da...] Posted March 13 Share Posted March 13 Hi everyone, in Calypso, is there any way to force the opening of a file (notification, photo, instructions, information, etc.) before running a program? I know about the measurement cycle information tab, but it doesn't work for what I need. I'm asking for something that prevents a program from running without first viewing a file. Thanks. Link to comment Share on other sites More sharing options...
[Ma...] Posted March 13 Share Posted March 13 I think you can do this with BAT file in inspection folder. Please sign in to view this quote. Can be found in manuals 02_PCM - Reference: Names of external PCM files Link to comment Share on other sites More sharing options...
[Sv...] Posted March 13 Share Posted March 13 You can store measurement sequence information and test plan comments. Images can be added to the measurement sequence information, and a forced start parameter can be set for CNC startup. Test plan comments are displayed on the right side of the Auto Run section when a program is selected. Measurement sequence information can be entered in the open test plan under the CNC tab, and comments can be entered under the Prepare tab. Link to comment Share on other sites More sharing options...
[Da...] Posted March 13 Author Share Posted March 13 Please sign in to view this quote. But how do I add the information? Link to comment Share on other sites More sharing options...
[Ma...] Posted March 13 Share Posted March 13 You could add a Programmable Stop in the strategy of the first measured feature. Drag it up to under the Clearance Data. Open the Programmable Stop and select your photo, document, text file, etc In addition, you can include your own text for the acknowledgement. When the program is started your document will appear and when they close it after viewing they will still need to click Cancel or Continue for acknowledgement. 1 Link to comment Share on other sites More sharing options...
[Sv...] Posted March 16 Share Posted March 16 Open a test plan, then go to the Prepare tab > Test Plan Comment. This will then appear in Auto Run on the right side. For measurement sequence information, with the test plan open, go to the CNC tab > Measurement Sequence Information and select the image. Under CNC > Start Conditions, you can then select Force Call at CNC Start. 1 Link to comment Share on other sites More sharing options...
[Da...] Posted March 16 Author Share Posted March 16 Please sign in to view this quote. Good morning, Thank you so much, I did it, and thanks to you all! Link to comment Share on other sites More sharing options...
[Da...] Posted March 16 Author Share Posted March 16 Please sign in to view this quote. Good morning, Thank you so much, I did it, and thanks to you all! Link to comment Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in