[Do...] Posted August 15, 2024 Share Posted August 15, 2024 How would I go about programming my alignment based off of the datum targets that are shown in the sketch below?2024-08-15 13_17_44-Zoom Meeting.png Link to comment https://qualityforum.zeiss.com/topic/5076-programming-datum-targets/ Share on other sites More sharing options...
[Da...] Posted August 15, 2024 Share Posted August 15, 2024 From Calypso help: RPS is short for Reference Point System. RPS alignment is based on the 3-2-1 rule. Number of points at least 3,maximum 6 A coordinate (e.g. Z) is fixed 3 times A coordinate (e.g. Y) is fixed 2 times A coordinate (e.g. X) is fixed 1 time RPS alignment is usually an iterative process performed with the aid of a loop. Unlike other methods, RPS alignment is based on the points that are specified in the drawing of the workpiece. Alignment is therefore subject to rules and is not wholly user-definable. One of the advantages is therefore that different results obtained with a given workpiece are comparable because they are all based on the same system of coordinates. Link to comment https://qualityforum.zeiss.com/topic/5076-programming-datum-targets/#findComment-17106 Share on other sites More sharing options...
[Cl...] Posted August 15, 2024 Share Posted August 15, 2024 How is this any different than a Plane > Line > Point? Link to comment https://qualityforum.zeiss.com/topic/5076-programming-datum-targets/#findComment-17108 Share on other sites More sharing options...
[Da...] Posted August 15, 2024 Share Posted August 15, 2024 Create a plane where the A points go (Plane A) then create one where the B points are (Plane B) and then one more where the C point is (Plane C). Now you can use the dimensions given to properly locate the target points. For example A1 is 25 from Plane B and 80 from Plane C, ect. Link to comment https://qualityforum.zeiss.com/topic/5076-programming-datum-targets/#findComment-17110 Share on other sites More sharing options...
[Ma...] Posted August 15, 2024 Share Posted August 15, 2024 (A) If you have a model then you can use points and for strategy you can make pointcloud of area defined by radius - it will generate points within radius ( here is d8 ) - then recall all points into plane and then proceed with your standards ( ASME / ISO ). (B) is just line with two points Link to comment https://qualityforum.zeiss.com/topic/5076-programming-datum-targets/#findComment-17112 Share on other sites More sharing options...
[To...] Posted August 16, 2024 Share Posted August 16, 2024 Please sign in to view this quote. Other than the 3 points on A need to cover 8mm diameter area, there is no difference. Link to comment https://qualityforum.zeiss.com/topic/5076-programming-datum-targets/#findComment-17114 Share on other sites More sharing options...
[Ke...] Posted August 16, 2024 Share Posted August 16, 2024 I concur with: - using a "Point" with "Define Point Set" with a 4mm Radius, for Datum A points that are recalled into a plane. - using a "Point" for Datum C - I have never seen the B Datum targets called out like that. It seems like if they wanted them to be points, then they would have called them out like Datum C in the End View(?) I would use all of these targets in the Base Alignment, and Loop the alignment, with a break condition. Link to comment https://qualityforum.zeiss.com/topic/5076-programming-datum-targets/#findComment-17116 Share on other sites More sharing options...
[To...] Posted August 16, 2024 Share Posted August 16, 2024 Please sign in to view this quote. I noticed that they dimensioned C from A but didn't dimension B. One "might" assume they are both at same height. though maybe the engineer was planning to use 2 vertical shafts on the fixture, which would pick up the highest points on that surface Link to comment https://qualityforum.zeiss.com/topic/5076-programming-datum-targets/#findComment-17118 Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in