[Do...] Posted August 15 Share Posted August 15 How would I go about programming my alignment based off of the datum targets that are shown in the sketch below?2024-08-15 13_17_44-Zoom Meeting.png Link to comment Share on other sites More sharing options...
[Da...] Posted August 15 Share Posted August 15 From Calypso help: RPS is short for Reference Point System. RPS alignment is based on the 3-2-1 rule. Number of points at least 3,maximum 6 A coordinate (e.g. Z) is fixed 3 times A coordinate (e.g. Y) is fixed 2 times A coordinate (e.g. X) is fixed 1 time RPS alignment is usually an iterative process performed with the aid of a loop. Unlike other methods, RPS alignment is based on the points that are specified in the drawing of the workpiece. Alignment is therefore subject to rules and is not wholly user-definable. One of the advantages is therefore that different results obtained with a given workpiece are comparable because they are all based on the same system of coordinates. Link to comment Share on other sites More sharing options...
[Cl...] Posted August 15 Share Posted August 15 How is this any different than a Plane > Line > Point? Link to comment Share on other sites More sharing options...
[Da...] Posted August 15 Share Posted August 15 Create a plane where the A points go (Plane A) then create one where the B points are (Plane B) and then one more where the C point is (Plane C). Now you can use the dimensions given to properly locate the target points. For example A1 is 25 from Plane B and 80 from Plane C, ect. Link to comment Share on other sites More sharing options...
[Ma...] Posted August 15 Share Posted August 15 (A) If you have a model then you can use points and for strategy you can make pointcloud of area defined by radius - it will generate points within radius ( here is d8 ) - then recall all points into plane and then proceed with your standards ( ASME / ISO ). (B) is just line with two points Link to comment Share on other sites More sharing options...
[To...] Posted August 16 Share Posted August 16 Please sign in to view this quote. Other than the 3 points on A need to cover 8mm diameter area, there is no difference. Link to comment Share on other sites More sharing options...
[Ke...] Posted August 16 Share Posted August 16 I concur with: - using a "Point" with "Define Point Set" with a 4mm Radius, for Datum A points that are recalled into a plane. - using a "Point" for Datum C - I have never seen the B Datum targets called out like that. It seems like if they wanted them to be points, then they would have called them out like Datum C in the End View(?) I would use all of these targets in the Base Alignment, and Loop the alignment, with a break condition. Link to comment Share on other sites More sharing options...
[To...] Posted August 16 Share Posted August 16 Please sign in to view this quote. I noticed that they dimensioned C from A but didn't dimension B. One "might" assume they are both at same height. though maybe the engineer was planning to use 2 vertical shafts on the fixture, which would pick up the highest points on that surface Link to comment Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in