[Ka...] Posted June 23, 2024 Share Posted June 23, 2024 Hello Is it possible to change the sequence in the autorun pallet using PCM? I have a pallet with 100 positions, operator load 55 parts in pallet position 2-56, the operator selects all used positions manually by clicking but never cares about the sequence, just selects the correct icons. On the operator account is not possible to turn on a different method of entry (like a loop) I want to change the sequence to: 2,56,3,4,5,......,55 lower number, highest Number, all other growing I know how to read actual sequences and sort them as required. S=chr(34) First=getRecordHead("firstpalletlocationnumber") Actual=getRecordHead("palletlocationnumber") if First==Actual then Last=getRecordHead("lastpalletlocationnumber") addToFile("C:\temp\pre.txt","Last="+S+Last+S) Sequence=getRecordHead("palletlocationnumberselection") if Sequence=="" then Sequence="1" First="1" Last="1" endif //sorting part removed to reduce syntax i=0 repeat i=i+1 PalletNo=strElement(i,",",Sequence) until PalletNo=="" PalletNo=i-1 if PalletNo>2 then SequenceN=""+PalletNo[1]+","+PalletNo[PalletNo] for i=2 to PalletNo-1 SequenceN=SequenceN+","+PalletNo next i addToFile("C:\temp\pre.txt","SequenceN="+S+SequenceN+S) endif endif But how to send this information to Calypso to run in this sequence? Many thanks Link to comment https://qualityforum.zeiss.com/topic/5414-change-pallet-sequence-using-pcm/ Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in