[Ni...] Posted May 8, 2024 Share Posted May 8, 2024 Hi, Is there a step-by-step document that shows how to setup a Rotary table on the Simulation Planner? I have never used one before so i have no idea how to set it even on the CMM. Thank You, Nixon Uruchima Link to comment Share on other sites More sharing options...
[Ca...] Posted May 9, 2024 Share Posted May 9, 2024 Hello Nixon, If you're located in the US, you can access the Knowledge Base on the ZEISS Portal that has a few step by step guides for simulation, this is one that goes through locating the Rotary Table: https://portal.zeiss.com/knowledge-base?id=855892 Thank you! Link to comment Share on other sites More sharing options...
[M1...] Posted Wednesday at 08:41 AM Share Posted Wednesday at 08:41 AM Does anyone have some good instructions on how to use RT in simulation, because the workpiece is almost always way off from the center of the RT when simulating a run. I can´t accesss the knowledge base. Link to comment Share on other sites More sharing options...
[Ri...] Posted Wednesday at 01:30 PM Share Posted Wednesday at 01:30 PM CALYPSO Planner/Simulation: How to Locate the Rotary Table Written by Robert Bala This Document Focuses on How to Update the Location of the Rotary Table Step 1: Launch CALYSPO. Step 2: Go under Extra, setting, and then CMM Step 3: Choose the machine that has the set-up ready for the Rotary table Step 4: Check “Simulation” and click “Connect” Step 5: Minimize the traffic light dialog box. Step 6: Open a new measurement plan. Step 7: Activate the Feature tab and from the Menu, select “Features”, then choose “Circle” Step 8: Double click the “Circle”, and enter nominal data 320 for X, -200 for Y, -500 for Z, and 250mm for the diameter D Step 9: Double click “Strategy” Step 10: Single click on the “Circle Path” and click “OK” Step 11: Click the “Measurement” tab, and double click “Rotary Table (RT)” Step 12: Check “RT activated for this measurement plan” Step 13: Then, click “OK” Step 14: Select "Resources", navigate to "RT Functions", then choose “RT position...” Step 15: Click on “Feature for rough pos. of RT axis” Step 16: Choose “Circle1” and keep the z-axis, and then click “OK” Step 17: Choose “Yes” to overwrite the existing RT position. Step 18: Double click the Rotary Table icon, again. Step 19: check “RT activated for this measurement plan” Step 20: Then, click “OK” Step 21: Select Planner from the toolbar Menu, turn on “Measurement plan simulation.” Step 22: Then, click the “show CMM” icon. RESULTS: Notice that the location of the rotary table is at y= -200mm. If for some reason the table is not centered, or you need to move it, see below: There is a readable file called “rotarytableaxis_sim” is in the directory: (C:\Users\Public\Documents\Zeiss\CALYPSO\workarea\basesystems) Open the file up with notepad and modify the “#vector” (x,y,z) values to position the table. The “#DirectionVector” (x,y,z) values should be set to (0,0,1). You might also need to position the part CAD file in the normal positioning method. I would use the same X,Y,Z offset values that the RT is set to and then everything should line up. 1 Link to comment Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in